Matindok Gas Development Project (MGDP), PT Pertamina EP
ID Proyek
14HO-056EI
Pelanggan
PT. Boma Bisma Indra for Konsorsium WIKA – TECHNIP
Jenis
STHE
Nama Peralatan
Amine/Amine Exchangers, 340-E-1002A/B/C Stripping Reboiler, 340-E-1005 Gas Gas Exchanger, 360-E-1001
Lingkup Pekerjaan
Thermal Design & Warranty
Berat (Kg)
Amine Exchangers: 15.472 Stripping Reboiler: 20.233 Gas Gas Exchanger: 6.666
Tahun Dibangun
2015
Kode/Standar
Amine Exchangers ASME VIII Div. 1 & TEMA AFS Stripping Reboiler ASME VIII Div. 1 & TEMA BKU Gas Gas Exchanger ASME VIII Div. 1 & TEMA BEU
Hubungi Kami untuk Laporan Lengkap